58win - Nổ Hũ Đổi Thưởng Nhanh Chóng Và An

CHUNG TAY ỦNG HỘ BÃO LŨ MIỀN BẮC

Hotline: 0979823639

Thêm giỏ hàng thành công.
Banner mobi
Construction method statement of Prefabricated steel building in Viet Nam

Hello friend! Are you looking for a construction method statement of prefabricated steel building in Vietnam but you don’t know where to show it in detail, clearly and easily to understand. So I congrats you have found the correct address. Let’s find out with us what it is. Let’s go.

Prefabricated steel building installing steps in Vietnam.

After the Constructor receives the design documents from the Investor. They will proceed with fabricating all components at their factory and then bring it to site, the last task is installing the building.

With the purpose of ensuring safe and quality for the building, the construction method statement have to done with the following steps:

 

Step 1: Installation of foundation bolts.

Installation of foundation bolts is always the first step of this process. The foundation bolts are installed in the designed position as correct as possible before foundation concrete is poured.

                

                                                                                                                                Source from internet​​​​​                                                                                        Source from FB Nguyễn Giang Nam

                                                                                                                                                                                                                                                                

Step 2: Installing the main frame.

This step is the main part of installation of fabricated steel buildings,  depending on the size of the frame, the crane is arranged for construction or not. If the span of  the frame is more than 30m, we have to arrange the crane to install.

 

             

                                                                                                             Source from internet​​​​​     ;                                                                                                        Source from internet

 

Installing the first column and trusses is the most important, since it will shape all the building. Depending on the construction site, we can install columns and trusses first from the middle span of the building and then develop to the two sides of the gable, or deploy from the gable. Usually we should deploy installation from the gable to the middle.

 

            

                                                                       Source from FB Nguyễn Giang Nam                                                                                                                                  ;       Source from internet​​​​​ 

 

After erecting the first columns and trusses, we have to brace and fix them tightly by bolts  so that it can not be moved by any impact.

 

Step 3: Construction of prefabricated steel building slab

To the building without the slab, skip this step.

 

                                                                                                                                                                                                                                  Source from FB Nguyễn Giang Nam    

 

To the building more than two levels, slab is required. After completing the construction of the main frame we proceed to erect the slab support girders, depending on the material of the slab, the construction method will be different. For example, if we use a Deck slab, we still install reinforcement and pour the concrete like a normal concrete slab, if it is an aerated concrete slab, we skip the reinforcement stage ...

 

                                                                                                                                                                                                                                         Source from internet​​​​​ 

 

Step 4: Roof installation  

 

                                                                                                                                                                                                                                                           Source from internet​​​​​ 

 

Installation of  roof  is conducted after the main frame erection and slab have completed an accurate alignment, the bolts, braces were caught tight.

As well as the installation of the main frame, the installation of roofing sheets also requires the first plate must be done very carefully, this is the focal point for the panels will be installed later.

         

                                                                                                               Source from internet​​​​​                                                                                                           Source from internet​​​​​ 

 

To the site using additional insulating cotton under the roof, this must be implemented to ensure that the insulating cotton joints are straight, not stretched, the underside of the insulating cotton is evenly flat. not wrinkled.

Attention: Installing the roof from 2 gables to the middle if there is no expansion joint according to the design.

 

Step 5: Erection corrugated wall

 

         

                                                                                                                                    Source from internet​​​​​                                                                                                                       Source from internet​​​​​ 

 

The Stage of installation of a corrugated wall like installing a corrugated sheet roof .. The construction of the wall is not as complicated as construction of corrugated roof for corrugated wall aperture is not too long. The remarkable point when constructing the roofing wall is to combine with the contractor from the beginning to ensure the work match between the prefabricated steel building party with the construction.

 

Step 6: Finishing works

The finishing work is the last stage of  the construction of a Prefabricated steel building, it requires meticulousness and precision in each stage. The opening at the connection points of corrugated iron with iron, opening  at the ventilation doors to ensure that it would not leak and quality.

 

Other stages in the finishing work.

                                                                                                                                                                                                                                                          Source from internet​​​​​ 

 

Stage: Marking, dividing traffic lanes (For factories)                               

                                                                                                                                                                                                                                                         Source from internet​​​​​ 

 

Stage: Gypsum panel installation

                                                                                                                                                                                                                                                         Source from internet​​​​​ 

 

Stage: Landscape work

                                                                                                                                                                                                                                                           Source from internet​​​​​ 

 

The last stage: Cleaning put into use.

 

This is the last stage and very important , before handing over to the Investor, the contractor must perform 5S work, cleaning the whole project. Maybe during the construction process you do very well, but the final cleaning step you are subjective can lead to discrediting the contractor.

 

Note: The process of installation of prefabricated  steel buildings must be done strictly in accordance with the order to ensure safety; consistency and professionalism; minimize errors to a minimum during erection. In particular, the method of construction and erection must be uniform and supervised by a team of experienced engineers - architects.

 

Conclusion of  construction method statement of  prefabricated steel buildings.

Currently, in order to provide optimal cost-saving, time-saving and sustainable construction solutions, INDUSVINA provides construction and installation services for prefabricated steel buildings to clients and investors. The company is highly appreciated for production capacity, modern machinery system as well as professionalism in consulting, maintenance, and warranty after handing over.

Hope the above information is helpful to you!

You will be consulted for a free, full package in designing and construction  with the most reasonable cost on the market - quality and progress are always guaranteed.

Phone number for free consultant: (+84)915163486  Mr. Nam

In particular, you will be supported for free 3D drawings .

Tin liên quan
BIỆN PHÁP THI CÔNG NHÀ  CÔNG NGHIỆP BIỆN PHÁP THI CÔNG NHÀ CÔNG NGHIỆP
Ngày nay để cạnh tranh được trên thị trường các doanh nghiệp cần phải đáp ứng những đòi hỏi khắt khe của khách hàng và phải tiết kiệm được chi...
Xem chi tiết
BIỆN PHÁP THI CÔNG MÓNG BĂNG BIỆN PHÁP THI CÔNG MÓNG BĂNG
Móng băng được xem là kết cấu kỹ thuật cơ bản để xây dựng nên một công trình đạt chuẩn. vậy biện pháp thi công móng băng là gì? hãy cùng indusvina...
Xem chi tiết
BIỆN PHÁP THI CÔNG MÓNG ĐƠN BIỆN PHÁP THI CÔNG MÓNG ĐƠN
Trong xây dựng, các loại móng nhà thường được sử dụng linh hoạt để phù hợp với thực tế địa chất của từng công trình. Bên cạnh móng băng, móng...
Xem chi tiết
Làm việc tại nhà mùa dịch Làm việc tại nhà mùa dịch
Tình hình dịch bệnh Covid 19 đang diễn biến hết sức phức tạ, số lượng ca nhiễm từng ngày vẫn tăng cao và chưa có dấu hiệu dừng lại, việc di chuyển...
Xem chi tiết
BIỆN PHÁP THI CÔNG ÉP CỌC BÊ TÔNG CỐT THÉP BIỆN PHÁP THI CÔNG ÉP CỌC BÊ TÔNG CỐT THÉP
Biện pháp thi công ép cọc được sử dụng phổ biến nhất hiện nay là gì? Làm thế nào để áp dụng biện pháp thi công ép cọc một cách dễ dàng và chính...
Xem chi tiết
Phát hành trái phiếu doanh nghiệp để hoàn thành 3.800km đường cao tốc Phát hành trái phiếu doanh nghiệp để hoàn thành 3.800km đường cao tốc
Huy động vốn qua phát hành trái phiếu doanh nghiệp hiện đã được luật định, đây là giải pháp hợp lý khi mở ra lối đi cho các nhà đầu tư có thể tham...
Xem chi tiết
2.870.000 tỷ đồng sẽ được phân bổ như thế nào trong kế hoạch đầu tư công trung hạn giai đoạn 2021-20 2.870.000 tỷ đồng sẽ được phân bổ như thế nào trong kế hoạch đầu tư công trung hạn giai đoạn 2021-20
Trình bày tờ trình "Tình hình, kết quả thực hiện Kế hoạch đầu tư công trung hạn giai đoạn 2016-2020 và dự kiến giai đoạn 2021-2025" trước Quốc hội,...
Xem chi tiết
Startup từ chối nhận đầu tư 1 triệu đô trong chương trình Shark Tank là ai? Startup từ chối nhận đầu tư 1 triệu đô trong chương trình Shark Tank là ai?
Gây ấn tượng đặc biệt khi từ chối nhận đầu tư 1 triệu USD từ Shark Bình và Shark Hưng, chủ sở hữu Công viên san hô Phú Quốc khẳng định giá trị...
Xem chi tiết
Nghiên cứu loại bê tông mới có thể tự vá lành vết nứt trong vòng 24 giờ Nghiên cứu loại bê tông mới có thể tự vá lành vết nứt trong vòng 24 giờ
Các nhà nghiên cứu phát triển một loại bê tông tự vá lành mới chứa enzyme có trong cơ thể người giúp tuổi thọ công trình tăng thêm 20 - 80 năm.
Xem chi tiết
2019 Copyright © CÔNG TY TNHH INDUSVINA
Đang online: 9   |   Ngày: 544   |   Tháng: 4658   |   Tổng truy cập: 564771
Hotline tư vấn miễn phí: 0979823639
Hotline: 0979823639
SMS: 0979823639

CÔNG TY TNHH INDUSVINA

CÔNG TY TNHH INDUSVINA

CÔNG TY TNHH INDUSVINA